1.5mm hdpe molecular polymer geomembrane liner use in fishpond
Description:
Geomembrane can be divided into PVC geomembrane, HDPE geomembrane, LDPE geomembrane, EVA geomembrane. They are mainly used in the subgrade anti-seepage of the roads, railways, etchant also applied to dealing with the leakage of landfills, dams, drains, tunnels and fish farms.
Technical data:
| National standard for ployethylene film GB/T17643-2011 |
thickness.mm | 0.5 | 0.75 | 1.0 | 1.25 | 1.5 | 2.0 |
Tensile yield strength (vertical and horizontal) N/mm | ≥7 | ≥11 | ≥15 | ≥18 | ≥22 | ≥29 |
Tensile breaking strength (vertical and horizontal) N/mm | ≥13 | ≥20 | ≥27 | ≥33 | ≥40 | ≥53 |
Elongation at break (vertical and horizontal) % | ≥700 |
Right angle tear strength (vertical and horizontal) N/mm | ≥62 | ≥93 | ≥125 | ≥160 | ≥190 | ≥250 |
Puncture strength N | ≥160 | ≥240 | ≥320 | ≥400 | ≥480 | ≥640 |
Carbon black content % | 2.0-3.0 |
Photos show:
Appliaction:
*River bank: road along the river and road covered with wart should be used complex earth film with reinforcing bars to protect the slope along the river.
* Road in loess area: in designing, drainage should be paid more attention, then take the measurements to head off and separate. Set up swash-proof and leakage proof.
*Long-time ice road: Drainage system should be established far away from the boot of the slope to prevent the water flow and leakage from influencing the changes of the “ice-road upper limit. Removing the underneath water will take away the underneath water which can probably from drumlin. When granule earth is used to build the road dike, the foot of the road dike should be set up with thin water partition to prevent the underneath water from gathering up to the road dike.
*Road in swelling earth area: for the road part of strong swelling earth and medium swelling earth in high way, the road should be designed as that kind of water proof, heat preservation, and wind proof NO leakage floor in the central separation area.
*Drainage, water proof and leakage proof in salty area: to prevent the ice swelling, salt swelling in salty area, thin water partition should be set up, 40-50 cm thick.Anti-filtration should be established on the top of it and at the foot of it: fabric of leakage proof can also be used such as complex earth film and complex earth film with reinforcing bar.
Production Line:
Loating:
Certificate:
Market:
Service team:
Contact:
FAQ
Q: Can you accept sample order?
A: Yes, we accept samples with little and reasonable charge.
Q: What is your MOQ?
A: Normally, 5000 m2 per order.Also we can according to your condition to set the MOQ.
Q: What is your delivery time? Can we short it in 7 days or less?
A: 5 days for sample,10-15days for mass production.
Q: What is your payment terms?
A: T/T (Bank surcharge 50$/order) or 30% deposit 70% L/C.
Q: How can I get my order?How can I know you sent the goods.
A: We will send you the goods by UPS, DHL, Fedex, Oversea Shipment or other forwarder, all with tracking number or B/L.
Q:How about your quality?
A: Try a small order, you will have your own judgment!
Re | | 0.5mm fishing hdpe geomembrane | LDPE 1.5 mm geomembrane | Short fiber knitting geotextile |